Your P6 schedule, reported.
The Herald turns your Primavera P6 schedules into a professional monthly progress report in minutes: a cover, contents, project summary, one fact sheet per package and an appendix, ready as PDF or PowerPoint.

A month of reporting, in minutes.
Every update, sorted for you
Point The Herald at a project folder. It reads the target and every update XER and sorts them by data date automatically.
The KPIs management asks for
SPI gauge and trend, progress against target, progress variance, earned this period, forecast finish with slip or recovery, and packages behind target.
A fact sheet per package
Packages and breakdowns by WBS level or any activity code, each with its own S-curve, progress bars and milestones.
Delay drivers, traced
The cause of each delay is traced from the longest path, so the report names what is driving the finish, not just how late it is.
Ready to sign
Cover with project, client and contractor logos, document control, sign-off boxes, contents and page numbers.
PDF or PowerPoint
Export a PDF in A4 landscape, or PowerPoint in any slide size: A4, A3, widescreen and more. Files are named “Project – data date”.
Many projects, one folder
Keep every project in one Projects folder, with a setup window and a session file for each.
English, Arabic and French
Reports in three languages, with full right-to-left layout for Arabic.
Works from XER files
No P6 database connection and no server. Your schedules stay on your own computer.
From XER to signed report.
A cover, contents, project summary, one fact sheet per package and an appendix, ready as PDF or PowerPoint.
Cover pageProject, client and contractor logos, headline KPIs, document control and sign-off.
ContentsEvery section and package fact sheet, with page numbers.
Project summarySPI, progress against target, forecast finish, S-curve and the status of every package.
Package fact sheetOne page per package: KPIs, S-curve, progress by trade, delay drivers, milestones and attention areas.Sample report with illustrative data. Click a page to see it full size.
Status you define. Delays you can’t miss.
Set the green, amber and red limits for SPI, progress variance and finish variance once per project. Every gauge, badge and table follows them, and delays are always shown negative and red.
- Packages by WBS level or any activity code
- Progress weighted by original duration, number of activities or selected resources
- Choose which packages appear and in what order, for example worst delay first
- Milestones you pick, and attention areas filled in by the planner
Three steps to your first result.
Point to the project folder
The Herald reads the target and every update XER, and sorts them by data date.
Choose packages and limits
Pick the WBS level or activity code, the progress weighting, the milestones and your status thresholds.
Export the report
Add the planner’s notes, then export a PDF or a PowerPoint in the slide size you need.
Does it need a P6 database connection?
How is progress weighted?
Can I edit the report after export?
Which languages are supported?
How is it licensed?
Your next monthly report, in minutes.
All features, no credit card, nothing to cancel. Your files stay on your computer.
